{"id":2129,"date":"2025-08-21T03:50:22","date_gmt":"2025-08-21T08:50:22","guid":{"rendered":"https:\/\/mgindusol.com\/?post_type=project&#038;p=2129"},"modified":"2026-05-18T15:47:53","modified_gmt":"2026-05-18T20:47:53","slug":"master-control-panel-for-electric-generators","status":"publish","type":"project","link":"https:\/\/mgindusol.com\/en\/projects\/master-control-panel-for-electric-generators\/","title":{"rendered":"Power Generation Master Control Panel"},"content":{"rendered":"\n<p>The project corresponds to the expansion of the Jorge Ch\u00e1vez International Airport (referred to as <em>newLIM<\/em>) and includes the implementation of the electrical power generation subsystem to ensure a reliable energy supply within the expanded airport infrastructure.<\/p>\n\n\n\n<p>The generation system consists of a power plant equipped with generator sets from a globally recognized brand, delivering a total standby capacity of 22 MW. The units operate in parallel and are managed through a <strong>Master Generation Control System (MGCS)<\/strong>, which includes a control panel engineered, manufactured, and commissioned by MG INDUSOL. This control panel manages multiple generator operating modes according to the control philosophy developed specifically for the project. An integrated Human-Machine Interface (HMI) enables comprehensive system monitoring and fully automated control.<\/p>\n\n\n\n<p>In addition, the solution integrates associated infrastructure, including power and control panels, as well as advanced protection and synchronization systems to ensure safe, efficient, and optimized operation.<\/p>\n\n\n\n<p>The project encompasses the design, engineering, supply, construction, operation, and maintenance of the power generation subsystem, with a strong focus on automation, supervision, and fault-response capabilities to ensure energy continuity in the airport\u2019s critical areas during unforeseen events.<\/p>\n\n\n\n<p>The system also provides backup and load support through a demand control logic designed to optimize the use of available generation capacity, improve fuel efficiency, and maintain adequate operational reserves.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project corresponds to the expansion of the Jorge Ch\u00e1vez International Airport (referred to as newLIM) and includes the implementation<\/p>\n","protected":false},"featured_media":1430,"template":"","industry":[50,72],"class_list":["post-2129","project","type-project","status-publish","has-post-thumbnail","hentry","industry-energia","industry-energy"],"acf":[],"_links":{"self":[{"href":"https:\/\/mgindusol.com\/en\/wp-json\/wp\/v2\/project\/2129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mgindusol.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/mgindusol.com\/en\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":3,"href":"https:\/\/mgindusol.com\/en\/wp-json\/wp\/v2\/project\/2129\/revisions"}],"predecessor-version":[{"id":3065,"href":"https:\/\/mgindusol.com\/en\/wp-json\/wp\/v2\/project\/2129\/revisions\/3065"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mgindusol.com\/en\/wp-json\/wp\/v2\/media\/1430"}],"wp:attachment":[{"href":"https:\/\/mgindusol.com\/en\/wp-json\/wp\/v2\/media?parent=2129"}],"wp:term":[{"taxonomy":"industry","embeddable":true,"href":"https:\/\/mgindusol.com\/en\/wp-json\/wp\/v2\/industry?post=2129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}